Keswick Basement Finishing Keswick · Sutton · Jackson's Point · Pefferlaw
Renovated basement living area with support columns and vinyl plank floors
Town of Georgina

Basement Permits in Georgina

When you need a building permit to finish a basement in Keswick, Sutton, Jackson's Point or Pefferlaw, what the Town asks for and how long it takes.

Book a site visit Call 416-995-4534
  • Zoning reply target: 5 business days
  • House review: 10 business days

Do you need a permit to finish a basement in Georgina?

Yes. The Town of Georgina lists basement finishing as work that needs a building permit.

Needs a building permit

  • Finishing a basement
  • Turning a basement room into a bedroom
  • Adding or changing plumbing
  • A basement apartment
  • Foundation damp-proofing and new weeping tile (their own permit)

No permit needed

  • Painting
  • Swapping cupboards with no plumbing changes

Electrical work needs a permit from the Electrical Safety Authority, not the Town.

What drawings does the Town need?

Existing floor plan

The basement as it is today.

New floor plan

Every room and closet labelled, with the plumbing fixtures marked.

Site plan

The house on the lot, with the well, septic and driveway shown.

How long does a basement permit take?

Applications go through the Town's online Building Permit Application Portal.

  1. 1

    Apply online

    Drawings and forms go in through the Town's portal.

  2. 2

    Zoning check

    The Town aims to answer in 5 business days.

  3. 3

    Building Code review

    10 business days for a house, once the application is complete.

  4. 4

    Permit issued

    Work can start. Comments from the Town add time, so complete drawings matter.

  5. 5

    Inspections

    Nothing gets covered until the inspector passes it.

Side walk-down basement entrance with a railing and exterior door

What is different about rural and lakeside lots?

Parts of Georgina are on well and septic, and parts sit near Lake Simcoe. Both can change what the Town asks for.

  • Adding a bedroom or bathroom: the Town checks the septic is big enough
  • A house on septic may not be allowed a basement apartment unless the system can take the extra load
  • Lots in the Lake Simcoe Region Conservation Authority's regulated area need its approval
  • Damp-proofing and new weeping tile need their own permit
Book a site visit

Basement permit questions

Do I need a permit to finish my basement in Keswick?

Yes. Finishing a basement, adding a bedroom and adding or changing plumbing all need a building permit from the Town of Georgina.

How long does a basement permit take in Georgina?

The Town aims to answer the zoning check in 5 business days, then has 10 business days to review a complete house permit. Comments from the Town add time.

Who handles the electrical permit?

The Electrical Safety Authority, separate from the Town's building permit.

Does the septic matter if I add a bedroom?

Yes. Adding a bedroom or bathroom means the Town checks the septic system is big enough.

Do I need a permit for waterproofing?

Foundation damp-proofing and new weeping tile need their own permit.

Do you handle the permit?

Yes. We draw the plans and apply through the Town's portal for you.

Finished basement living room with a large sectional

Book a site visit

Tell us about your basement and we'll call you back to set up a visit.

By sending this, you agree we can share your request with a contractor who serves your area. See our privacy policy.

Start with a look at your basement

A site visit shows what your space can hold and what the Town will ask for.

Book a site visit 416-995-4534