When you need a building permit to finish a basement in Keswick, Sutton, Jackson's Point or Pefferlaw, what the Town asks for and how long it takes.
Yes. The Town of Georgina lists basement finishing as work that needs a building permit.
Electrical work needs a permit from the Electrical Safety Authority, not the Town.
The basement as it is today.
Every room and closet labelled, with the plumbing fixtures marked.
The house on the lot, with the well, septic and driveway shown.
Applications go through the Town's online Building Permit Application Portal.
Drawings and forms go in through the Town's portal.
The Town aims to answer in 5 business days.
10 business days for a house, once the application is complete.
Work can start. Comments from the Town add time, so complete drawings matter.
Nothing gets covered until the inspector passes it.

Parts of Georgina are on well and septic, and parts sit near Lake Simcoe. Both can change what the Town asks for.
Yes. Finishing a basement, adding a bedroom and adding or changing plumbing all need a building permit from the Town of Georgina.
The Town aims to answer the zoning check in 5 business days, then has 10 business days to review a complete house permit. Comments from the Town add time.
The Electrical Safety Authority, separate from the Town's building permit.
Yes. Adding a bedroom or bathroom means the Town checks the septic system is big enough.
Foundation damp-proofing and new weeping tile need their own permit.
Yes. We draw the plans and apply through the Town's portal for you.
A site visit shows what your space can hold and what the Town will ask for.